A comprehensive Cat A and B fit-out, transforming a split demise floorplate into a modern, functional workspace. Despite significant logistical and technical challenges, the project was delivered on time, ensuring tenant readiness and compliance with accessibility standards.

Client challenges

Full refurbishment of existing Cat B space to Cat A and Cat B space.

A very short programme necessitating agility and delivery at speed to accommodate tenants who had already signed the lease of the Cat B demise.

City of London location and a fully occupied building made for complex internal and external logistics arrangements.

Transformational impact

Delivered a contemporary and functional Cat B space with a variety of ceiling designs, including exposed, mesh and enclosed ceilings.

Ensured the Cat B area was fully DDA compliant, including accessible kitchen counters and an elegant design inspired by the nearby Gherkin.

Successfully met a hard deadline, enabling tenant move-in on schedule despite significant logistical and technical hurdles.

From A to B

The floorplate was divided into two demises: one refurbished to Cat B level and the adjoining space finished to Cat A. Our scope also included redesigning and building the common parts lift lobby and WC facilities.

Facing a hard deadline, we completed the Cat B space in time for tenant move-in. The Cat B redesign features a contemporary ceiling design with black mesh, enclosed ceiling tiles, and exposed ceilings. The muted, elegant colour scheme subtly nods to the Gherkin and the kitchen counters are fully DDA compliant, ensuring accessibility. Atrium aluminium goal posts and LED strips enhance the entry experience.

Construction in an Occupied Building

We faced significant logistical challenges, including lift outages and coordinating noisy works to avoid disturbing occupants. A complex crane lift required closing a street, installing an acoustic panel, aligning with internal services, and reopening the street by day’s end. Early on, discrepancies between on-site technical services and documentation led our team to redesign the system, adding a month of work. Despite these obstacles, we strategically recovered time and delivered a contemporary, functional space meeting current market preferences.