Projects

Combining our three core specialisms with cross sector experience from a world-class team, we transform businesses through the built environment and enhance the way people work.

View all projects

London skyscraper interior redesign increases asset value

With a wide scope of works covering multiple floors, as well as ground floor reception, this fit-out in the iconic London skyscraper, 88 Wood St is a contemporary conversion of the original building design, giving it a modern feel with high quality detailing and top-quality materials, ultimately increasing the asset value.

Size

  • Large (130,000 sq. ft)

Location

  • London

Delivering a mesmerizing finish for an international top-grade building environment

The completed project will span to include delivering the completely re-designed reception, including enhanced welfare facilities, as well as a full high-spec CAT A office refurbishment of levels one to three and levels ten and eleven.

Working in collaboration with project managers Knight Frank and architects Morrow + Lorraine, we are delivering a mesmerising spatial experience using sophisticated details to create an international top-grade building environment.

Phase 1: Strip back and refurbish

Phase one has seen the full strip back to shell and core of the tenth and eleventh floors, encompassing new mechanical and electrical services with a vibrant “SAS mesh raft” ceiling detail that beautifully frames the new semi-exposed services.

Also included was the full refurbishment of the WC’s on five floors, with high specification stainless steel cubicles, terrazzo worktops, brushed stainless steel hardware and stylish feature lighting which come together to create a sophisticated finish.

Future work will include a more flexible style co-working area

Future CAT B works to the reception area will further modernise the building and include a full height 3 meter living wall, bespoke joinery and new full height glazing. The finished reception area will include a more flexible style co-working area, as well as a full barista style cafe offering and enhanced welfare facilities including cycle racks, showers and lockers. These works are currently being carried out whilst maintaining a fully operational reception. Full works are due for completion in February 2021.

Transforming 130,000 sq ft of tired space into functional space

The total size of the project reaches just over 130,000 sq ft of space, a scale which requires a strong delivery team and a trusted supply chain as well as a diligent detail design team working in close collaboration to ensure both a fuss free delivery and a seamless finish.

Looking to future proof your workplace?

Start a project